In detail
Since the existing network is made of fibre cement, once the new steel network was built, it was decided to remove and dispose of the old one in accordance with current regulations, thus guaranteeing the future safety of operators and people residing in the area. While underground and intact, fibre cement pipes are not dangerous to public health, but they require special maintenance which is carried out in absolute safety. For this reason, the removal of the pipelines was entrusted to a specialised company registered in the National Register of Environmental Managers under category 10, “Reclamation of goods containing asbestos”.
The average excavation depth is -1.40 metres from the surface. At the end of the works, a temporary restoration of the road surface is carried out. The final restoration and horizontal signage are completed after the necessary settling time of the ground.